42-481-33340
Final CompletionTAYLOR
WHARTON County · District 3 · ATAPCO · LISSIE SOUTH (FRIO 4400)
Permits
3
Max Depth
5,500 ft
First Permit
1990-01-02
Latest Activity
1992-04-14
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-01-28
Shut-In
—
Plugged
2003-09-29
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-09
Injection / Disposal
Permitted Volume
500 bbl/d
Max Pressure
1,000 psi
Injection Interval
4,117–4,140 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 148 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| MIOCENE (Miocene (undifferentiated)) | 3,245 ft | -3,097 ft |
| FRIO | 3,400 ft | -3,252 ft |
| VICKSBURG | 4,940 ft | -4,792 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 4,117–4,140 ft | Perforated |
| 4,258–4,258 ft | Perforated |
| 4,419–4,423 ft | Perforated |
| 4,432–4,434 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 637 ft | 351 sx |
| 4.5" | 4,637 ft | 950 sx |
Permit History (3)
Applications (3)
Records & Logs
5 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet