42-483-30483

Final Completion

EVANS

WHEELER County · District 10 · PIONEER PRODUCTION CORP. · BUFFALO WALLOW (MORROW)

RRC Lookup

Permits

3

Max Depth

15,350 ft

First Permit

1977-11-02

Latest Activity

2009-11-23

Lifespan

32 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-04-13

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: PIONEER PRODUCTION CORP. ≠ Production: DEVON ENERGY PRODUCTION CO, L.P. (reported 2014-06)

!

EWA / Permit operator mismatch

Scheduling: PIONEER PRODUCTION CORP. ≠ Permit: DEVON ENERGY PRODUCTION CO, L.P.

Resolved via: schedulingPIONEER PRODUCTION CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by DEVON ENERGY PRODUCTION CO, L.P. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#687677 A DEVON ENERGY PRODUCTION CO, L.P.
received 2009-11-19
#199026 A PIONEER PRODUCTION CORP.
received 1983-06-21
#12258 A AMARILLO OIL CO.
received 1977-11-02

Well Details

Well Number
107
Max Depth
15,350 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1978-04-13

Operator

Location
AMARILLO
P-5 Status
Y (filed 1986-07-15)
Total Permits
110

External Links

Live © 2026 Petrora