42-483-30623

Final Completion

ZYBACH

WHEELER County · District 10 · PHILCON DEVELOPMENT CO. · BUFFALO WALLOW EAST (-A- CHERT)

Permits

1

Max Depth

15,500 ft

First Permit

1979-03-14

Latest Activity

1979-03-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-25

Shut-In

Plugged

1982-10-20

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
14,740–14,758 ftPerforated

Casing (4)

SizeSet DepthCement
20"68 ft
8.625"3,373 ft2,700 sx
2.875"14,090 ft
5.5"14,648 ft650 sx

Permit History (1)

Applications (1)

#44243 A PHILCON DEVELOPMENT CO.
received 1979-03-14

Records & Logs

1 completion filing on record.

W-2/G-1 1979-07-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WHEELER County.

Well Details

Well Number
1
Max Depth
15,500 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
1979-06-25

Operator

Location
AMARILLO
P-5 Status
Inactive (filed 2011-07-12)
Cum Oil (all leases)
82,620 bbl
Cum Gas (all leases)
59,165,360 mcf
Total Permits
54