42-483-30752

HEFLEY 34

WHEELER County · District 10 · QEP ENERGY COMPANY

Permits

2

Max Depth

16,500 ft

First Permit

1980-04-18

Latest Activity

2011-02-01

Lifespan

31 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
14,200–14,366 ftPerforated

Casing (3)

SizeSet DepthCement
9.625"3,217 ft3,300 sx
2.875"14,115 ft
5.5"16,823 ft1,025 sx

Permit History (2)

Applications (2)

#709407 A QEP ENERGY COMPANY
received 2011-01-28
#78671 A MARSH, TOM F. INC.
received 1980-04-18

Records & Logs

1 completion filing on record.

W-2/G-1 1982-02-01

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WHEELER County.

Well Details

Well Number
1D
Max Depth
16,500 ft
Drill Type
Vertical
County
WHEELER
District
10

Operator

Location
MIDLAND
P-5 Status
Active (filed 2025-09-03)
Cum Oil (all leases)
81,898,994 bbl
Cum Gas (all leases)
35,691,144 mcf
Total Permits
745