42-483-30954
Final CompletionBRITT
WHEELER County · District 10 · PIONEER PRODUCTION CORP. · ALLISON-BRITT (12350)
Permits
1
Max Depth
12,942 ft
First Permit
1981-09-25
Latest Activity
1981-09-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-11-18
Shut-In
—
Plugged
1986-06-11
Formation Tops (6) Elevation 2,505 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BROWN DOLOMITE | 4,492 ft | -1,987 ft |
| TONKAWA | 9,654 ft | -7,149 ft |
| COTTAGE GROVE | 10,198 ft | -7,693 ft |
| HOGSHOOTER | 11,006 ft | -8,501 ft |
| CLEVELAND | 11,310 ft | -8,805 ft |
| GRANITE WASH | 12,054 ft | -9,549 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 12,256–12,814 ft | Perforated |
| ?–12,814 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 3,481 ft | 3,300 sx |
| 4.5" | 12,942 ft | 450 sx |
| 2.375" | 13,352 ft | — |
Permit History (1)
Applications (1)
#136128 A PIONEER PRODUCTION CORP.
received 1981-09-25
Records & Logs
3 completion filings on record.
W-2/G-1 1985-02-05
W-2/G-1 1985-02-23
W-2/G-1 1982-01-11
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WHEELER County.
Well Details
- Well Number
- 1-5R
- Max Depth
- 12,942 ft
- Drill Type
- Vertical
- County
- WHEELER
- District
- 10
- Operator
- PIONEER PRODUCTION CORP.
- Completed
- 1981-11-18
Operator
- Name
- PIONEER PROD CORP
- Location
- AMARILLO
- P-5 Status
- Inactive (filed 1985-08-06)
- Total Permits
- 110