42-483-31245
Final CompletionMITCHELL A
WHEELER County · District 10 · LIONHEART ENERGY CORPORATION · PANHANDLE EAST
Permits
1
Max Depth
2,300 ft
First Permit
1985-01-08
Latest Activity
1985-01-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: LIONHEART ENERGY CORPORATION ≠ Production: FAIRWAY LINKS ENERGY, INC. (reported 2006-07)
!
EWA / Permit operator mismatch
Scheduling: LIONHEART ENERGY CORPORATION ≠ Permit: HILL, HUB, INC.
Resolved via: scheduling → LIONHEART ENERGY CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (2)
#263428 A HILL, HUB, INC.
received 1985-06-17
#263428 A HILL, HUB, INC.
received 1985-01-08
Well Details
- Well Number
- 5
- Max Depth
- 2,300 ft
- Drill Type
- Vertical
- County
- WHEELER
- District
- 10
- Operator
- LIONHEART ENERGY CORPORATION
Operator
- Location
- DURANGO
- P-5 Status
- Y (filed 2026-01-05)
- Cum Oil (all leases)
- 82,896 bbl
- Cum Gas (all leases)
- 945,628 mcf
- Activities
- OPRS/G, OPRS/O