42-483-32483

Y

METHODIST HOME 2

WHEELER County · District 10 · QUESTAR EXPL. AND PROD. CO. · WHEELER N. (MORROW)

Permits

2

Max Depth

16,000 ft

First Permit

2007-10-24

Latest Activity

2009-08-05

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-06-23

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: QUESTAR EXPL. AND PROD. CO. ≠ Production: 4P ENERGY TEXAS, LLC (reported 2020-10)

Resolved via: schedulingQUESTAR EXPL. AND PROD. CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-06

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 2,476 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
BASE HEEBNER8,264 ft-5,788 ft
TONKAWA 8,897 ft-6,421 ft
GRANITE WASH 10,896 ft-8,420 ft
MORROW 14,940 ft-12,464 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (5)

IntervalType
11,237–12,740 ftPerforated
12,838–13,198 ftPerforated
13,282–13,960 ftPerforated
14,200–14,636 ftPerforated
15,066–15,298 ftPerforated

Casing (3)

SizeSet DepthCement
13.375"350 ft460 sx
9.625"3,156 ft900 sx
7"14,955 ft1,050 sx

Permit History (2)

Applications (2)

#683495 A QUESTAR EXPL. AND PROD. CO.
received 2009-07-27
#648149 A QUESTAR EXPL. AND PROD. CO.
received 2007-10-19

Records & Logs

4 completion filings on record · 2 with log images at RRC.

W-2/G-1 2010-02-08 log on file
W-2/G-1 2010-02-24
W-2/G-1 2008-07-25 log on file
W-2/G-1 2008-09-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WHEELER County.

Well Details

Well Number
1
Max Depth
16,000 ft
Drill Type
Vertical
County
WHEELER
District
10
Completed
2008-06-23

Operator

Location
SALT LAKE C, TY
P-5 Status
Inactive (filed 2009-09-15)
Cum Oil (all leases)
1,472,482 bbl
Cum Gas (all leases)
83,474,615 mcf
Total Permits
217