42-485-35482

Final Completion

FOSTER

WICHITA County · District 9 · HAIGOOD & CAMPBELL · WICHITA COUNTY REGULAR

Permits

1

Max Depth

1,900 ft

First Permit

1979-04-27

Latest Activity

1979-04-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-04-29

Shut-In

Plugged

1987-04-23

!

EWA / Permit operator mismatch

Scheduling: HAIGOOD & CAMPBELL ≠ Permit: LANDRUM PETRO CO.

Resolved via: schedulingHAIGOOD & CAMPBELL

Operator History

originally filed by LANDRUM PETRO CO. — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
1,342–1,346 ftPerforated

Casing (2)

SizeSet DepthCement
2.375"1,340 ft
4.5"1,820 ft225 sx

Permit History (1)

Applications (1)

#47346 A LANDRUM PETRO CO.
received 1979-04-27

Records & Logs

1 completion filing on record.

W-2/G-1 1979-10-17

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WICHITA County.

Well Details

Well Number
9
Max Depth
1,900 ft
Drill Type
Vertical
County
WICHITA
District
9
Completed
1979-04-29

Operator

Location
ARCHER CITY
P-5 Status
Inactive (filed 2020-12-30)
Cum Oil (all leases)
116,726 bbl
Cum Gas (all leases)
— mcf
Total Permits
20