42-485-38500

Final Completion

RED RIVER OIL CO., ET AL

WICHITA County · District 9 · WAGGONER, J. L.

Permits

2

Max Depth

2,000 ft

First Permit

1980-06-10

Latest Activity

1982-10-18

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Plugged 2005-12-27 UIC #000065059 permitted 1988-02-02

Permitted Volume

40 bbl/d

Max Pressure

200 psi

Injection Interval

420–440 ft

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
400' SAND420 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (2)

IntervalType
420–435 ftPerforated
425–437 ftPerforated

Casing (3)

SizeSet DepthCement
2.375"438 ft
4.5"478 ft60 sx
4.5"479 ft

Permit History (2)

Applications (2)

#174590 A WAGGONER, J. L.
received 1982-10-18
#83290 A WAGGONER, J. L.
received 1980-06-10

Records & Logs

2 completion filings on record.

W-2/G-1 1988-04-15
W-2/G-1 1983-08-15

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WICHITA County.

Well Details

Well Number
14
Max Depth
2,000 ft
Drill Type
Vertical
County
WICHITA
District
9

Operator

Location
ELECTRA
P-5 Status
Inactive (filed 1994-09-15)
Cum Oil (all leases)
4,909 bbl
Cum Gas (all leases)
— mcf
Total Permits
18