42-485-39612
Final CompletionPERKINS ESTATE
WICHITA County · District 9 · BENCO · WICHITA COUNTY REGULAR
Permits
1
Max Depth
600 ft
First Permit
1983-10-20
Latest Activity
1983-10-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-10-10
Shut-In
—
Plugged
2001-08-09
EWA / Production operator mismatch
Scheduling: BENCO ≠ Production: B.E.G. PRODUCTION (reported 1997-07)
EWA / Permit operator mismatch
Scheduling: BENCO ≠ Permit: KENT, LOUIS F.
Resolved via: scheduling → BENCO
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Injection / Disposal
Permitted Volume
—
Max Pressure
100 psi
Injection Interval
—
Injected (12mo)
—
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2)
CSV| Formation | Top Depth (MD) |
|---|---|
| PERMIAN (Permian (undifferentiated)) | 240 ft |
| PERMIAN (Permian (undifferentiated)) | 244 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 244–247 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 4.5" | 280 ft | 65 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record · 2 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet