42-485-42734

Final Completion

CLARK

WICHITA County · District 9 · JAMES DERYL · WICHITA COUNTY REGULAR

Permits

1

Max Depth

1,000 ft

First Permit

1992-11-18

Latest Activity

1992-11-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-12-17

Shut-In

Plugged

1998-04-10

!

EWA / Permit operator mismatch

Scheduling: JAMES DERYL ≠ Permit: TALON PRODUCTION, INC.

Resolved via: schedulingJAMES DERYL

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1)

CSV
FormationTop Depth (MD)
CISCO 566 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
566–570 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"615 ft90 sx

Permit History (1)

Applications (1)

#405694 A TALON PRODUCTION, INC.
received 1992-11-05

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1993-01-08 log on file
W-2/G-1 1993-01-21

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WICHITA County.

Well Details

Well Number
2
Max Depth
1,000 ft
Drill Type
Vertical
County
WICHITA
District
9
Operator
JAMES DERYL
Completed
1992-12-17

Operator

Location
NOCONA
P-5 Status
Active (filed 2026-05-19)
Cum Oil (all leases)
126,580 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
35