Permits
3
Max Depth
5,074 ft
First Permit
1981-01-06
Latest Activity
1988-11-07
Lifespan
8 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 438 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SAND, CALICHE | 1 ft | +437 ft |
| CARRIZO | 115 ft | +323 ft |
| WILCOX | 905 ft | -467 ft |
| NAVARRO | 1,790 ft | -1,352 ft |
| CHALK | 3,665 ft | -3,227 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 5,030–5,059 ft | Perforated |
| 5,030–5,080 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 10.75" | 112 ft | 80 sx |
| 5.5" | 5,028 ft | 625 sx |
| 2.375" | 5,030 ft | — |
Permit History (3)
Applications (3)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 5,074 ft
- Drill Type
- Vertical
- County
- WILSON
- District
- 1
- Operator
- JOHNSON OIL & GAS
Operator
- Name
- JOHNSON OIL & GAS
- Location
- AUSTIN
- P-5 Status
- Inactive (filed 1988-08-02)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1