42-493-31301

PRODUCING

TEMPERO MABEL

WILSON County · District 1 · LORENZ & BOSANKO · ACLETO CREEK (POTH SAND)

Permits

1

Max Depth

3,256 ft

First Permit

1983-06-24

Latest Activity

1983-06-24

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1983-12-01

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
3,064–3,069 ftPerforated

Casing (3)

SizeSet DepthCement
10.75"107 ft77 sx
2.375"3,004 ft
4.5"3,150 ft480 sx

Permit History (1)

Applications (1)

#199649 A LORENZ & BOSANKO
received 1983-06-24

Records & Logs

1 completion filing on record.

W-2/G-1 1983-12-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WILSON County.

Well Details

Well Number
1
Max Depth
3,256 ft
Drill Type
Vertical
County
WILSON
District
1
Completed
1983-12-01

Operator

Location
SAN ANTONIO
P-5 Status
Active (filed 2025-06-19)
Cum Oil (all leases)
15,998 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
2