Permits
2
Max Depth
5,300 ft
First Permit
1987-08-14
Latest Activity
1991-03-26
Lifespan
4 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2008-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3)
CSV| Formation | Top Depth (MD) |
|---|---|
| AUSTIN CHALK | 5,000 ft |
| EAGLEFORD (Eagle Ford) | 5,180 ft |
| BUDA | 5,200 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 5,040–5,200 ft | Perforated |
Casing (1)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 530 ft | 590 sx |
Permit History (2)
Applications (2)
#386024 A ALLIED RESOURCES TEXAS
received 1991-03-22
#334309 A HOLLUB, LAMBERT DRILLING COMPANY
received 1987-08-10
Records & Logs
2 completion filings on record · 1 with log images at RRC.
W-2/G-1 1989-09-13 log on file
W-2/G-1 1989-09-21
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in WILSON County.
Well Details
- Well Number
- 2
- Max Depth
- 5,300 ft
- Drill Type
- Directional, Sidetrack
- County
- WILSON
- District
- 1
- Operator
- ALLIED RESOURCES TEXAS
Operator
- Name
- ALLIED RES TEXAS
- Location
- SAN ANTONIO
- P-5 Status
- Inactive (filed 1991-01-07)
- Total Permits
- 6