Permits
1
Max Depth
6,100 ft
First Permit
1977-12-29
Latest Activity
1977-12-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1978-03-13
Shut-In
—
Plugged
1980-08-07
EWA / Permit operator mismatch
Scheduling: GAGE & CO. ≠ Permit: CRAWFORD ENERGY
Resolved via: scheduling → GAGE & CO.
Operator History
originally filed by CRAWFORD ENERGY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 545–3,750 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 537 ft | 400 sx |
| 4.5" | 1,761 ft | 250 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 6,100 ft
- Drill Type
- Vertical
- County
- WISE
- District
- 9
- Operator
- GAGE & CO.
- Completed
- 1978-03-13
Operator
- Name
- GAGE & CO
- Location
- FORT WORTH
- P-5 Status
- Inactive (filed 1982-03-05)
- Total Permits
- 48