42-497-33228

Final Completion

HOLLINGSWORTH W. W. B

WISE County · District 9 · DEVON ENERGY PRODUCTION CO L.P. · DALY NORTH (3150 SAND)

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1987-05-06

Latest Activity

1987-05-06

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-08-14

Shut-In

Plugged

2011-02-14

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: MITCHELL ENERGY CORPORATION

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2011-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#329437 A MITCHELL ENERGY CORPORATION
received 1987-04-24

Well Details

Well Number
5
Max Depth
4,500 ft
Drill Type
Vertical
County
WISE
District
9
Completed
1987-08-14

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora