Permits
1
Max Depth
3,000 ft
First Permit
2003-10-28
Latest Activity
2003-10-28
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2019-07-27
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Permit operator mismatch
Scheduling: NUGE LLC ≠ Permit: WEST FORK TANK TRUCKS, INC.
Resolved via: scheduling → NUGE LLC
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
4,000 bbl/d
Max Pressure
1,000 psi
Injection Interval
2,050–2,450 ft
Injected (12mo)
163,648 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-09-01)
Operator History
originally filed by WEST FORK TANK TRUCKS, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 967 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| BUTTRAM | 2,192 ft | -1,225 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (4)
| Interval | Type |
|---|---|
| 2,192–2,242 ft | Perforated |
| 2,192–2,380 ft | Perforated |
| 2,264–2,356 ft | Perforated |
| 2,362–2,380 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 5.5" | 2 ft | 600 sx |
| 8.625" | 617 ft | 415 sx |
| 5.5" | 2,606 ft | 600 sx |
Permit History (1)
Applications (1)
Records & Logs
3 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet