42-501-32157

Final Completion

CLAWATER E. W.

YOAKUM County · District 8 · MOBIL PRODUCING TX. & N.M. INC. · BRAHANEY NORTHWEST (DEVONIAN)

RRC Lookup

Permits

2

Max Depth

12,000 ft

First Permit

1981-10-23

Latest Activity

1990-10-17

Lifespan

9 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-04-28

Shut-In

Plugged

1989-10-04

!

EWA / Production operator mismatch

Scheduling: MOBIL PRODUCING TX. & N.M. INC. ≠ Production: MCCLURE OIL COMPANY, INC. (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: MOBIL PRODUCING TX. & N.M. INC. ≠ Permit: FULLER PETROLEUM, INC.

Resolved via: productionMCCLURE OIL COMPANY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#379227 A FULLER PETROLEUM, INC.
received 1990-10-10
#138432 A MOBIL PRODUCING TX. & N.M. INC.
received 1981-10-23

Well Details

Well Number
1
Max Depth
12,000 ft
Drill Type
Vertical
County
YOAKUM
District
8
Completed
1989-04-28

Operator

Location
SPRING
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
181,898,111 bbl
Cum Gas (all leases)
1,950,074,148 mcf
Activities
CSGD/G, GTHS/C, GTHS/G, OPRS/G
Total Permits
6,763

External Links

Live © 2026 Petrora