42-503-36230
Final CompletionSTEELE W. E.
YOUNG County · District 9 · KARPER COMPANY THE · SEWELL (CADDO)
Permits
1
Max Depth
4,110 ft
First Permit
1982-08-12
Latest Activity
1982-08-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-09-01
Shut-In
—
Plugged
1983-10-21
EWA / Permit operator mismatch
Scheduling: KARPER COMPANY THE ≠ Permit: KARPER & GLASS OIL COMPANY
Resolved via: scheduling → KARPER COMPANY THE
Operator History
originally filed by KARPER & GLASS OIL COMPANY — asset transferred
Formation Tops
No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.
Perforations (1)
| Interval | Type |
|---|---|
| 3,882–4,062 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 254 ft | 175 sx |
| 2.375" | 4,025 ft | — |
| 4.5" | 4,110 ft | 100 sx |
Permit History (1)
Applications (1)
Records & Logs
1 completion filing on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- F2
- Max Depth
- 4,110 ft
- Drill Type
- Vertical
- County
- YOUNG
- District
- 9
- Operator
- KARPER COMPANY THE
- Completed
- 1982-09-01
Operator
- Name
- KARPER CO, THE
- Location
- GRAHAM
- P-5 Status
- Inactive (filed 2002-03-27)
- Cum Oil (all leases)
- 274,466 bbl
- Cum Gas (all leases)
- 4,978,383 mcf
- Total Permits
- 54