42-503-36371

Final Completion

BOYDSTON DON

YOUNG County · District 9 · HAYS & BOYDSTON · JEAN NW. (CADDO)

Permits

1

Max Depth

4,800 ft

First Permit

1982-10-15

Latest Activity

1982-10-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-03-03

Shut-In

Plugged

1987-01-07

!

EWA / Permit operator mismatch

Scheduling: HAYS & BOYDSTON ≠ Permit: RAILHEAD ENERGY COMPANY

Resolved via: schedulingHAYS & BOYDSTON

Operator History

originally filed by RAILHEAD ENERGY COMPANY — asset transferred

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (1)

IntervalType
4,442–4,452 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"797 ft530 sx
2.375"4,423 ft
4.5"4,609 ft250 sx

Permit History (1)

Applications (1)

#174461 A RAILHEAD ENERGY COMPANY
received 1982-10-15

Records & Logs

1 completion filing on record.

W-2/G-1 1983-03-10

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in YOUNG County.

Well Details

Well Number
1
Max Depth
4,800 ft
Drill Type
Vertical
County
YOUNG
District
9
Completed
1983-03-03

Operator

Location
GRAHAM
P-5 Status
Inactive (filed 1993-05-13)
Cum Oil (all leases)
18,976 bbl
Cum Gas (all leases)
29,252 mcf
Total Permits
33