Permits
1
Max Depth
5,700 ft
First Permit
1984-06-05
Latest Activity
1984-06-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-11-26
Shut-In
—
Plugged
1987-06-20
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (2)
CSV| Formation | Top Depth (MD) |
|---|---|
| CADDO | 4,384 ft |
| MARBLE FALLS | 4,760 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,798–4,806 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 400 ft | 290 sx |
| 4.5" | 5,006 ft | 150 sx |
Permit History (1)
Applications (1)
#241033 A PERCO
received 1984-06-01
Records & Logs
2 completion filings on record.
W-2/G-1 1984-12-27
W-2/G-1 1985-01-17
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in YOUNG County.