42-505-32820

Final Completion

VELA-SMITH GAS UNIT

ZAPATA County · District 4 · BRIDGE OIL PRODUCTION CO. INC. · ROLETA (8150)

RRC Lookup

Permits

2

Max Depth

9,550 ft

First Permit

1991-08-22

Latest Activity

1992-04-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-12-02

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: BRIDGE OIL PRODUCTION CO. INC. ≠ Production: MERIT ENERGY COMPANY (reported 2025-12)

Resolved via: productionMERIT ENERGY COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#398816 A BRIDGE OIL PRODUCTION CO., INC.
received 1992-04-28
#391013 A BRIDGE OIL PRODUCTION CO., INC.
received 1991-08-19

Well Details

Well Number
4
Max Depth
9,550 ft
Drill Type
Vertical
County
ZAPATA
District
4
Completed
1991-12-02

Operator

Location
MIDLAND
P-5 Status
Y (filed 1993-05-07)
Cum Oil (all leases)
115,063 bbl
Cum Gas (all leases)
13,879,928 mcf
Total Permits
97

External Links

Live © 2026 Petrora