42-077-02256
Final CompletionSCOTT R. -B-
CLAY County · District 9 · LYON OPERATING COMPANY INC.(III) · DILLARD SE. (ELLENBURGER)
Permits
1
Max Depth
8,300 ft
First Permit
1994-09-19
Latest Activity
1994-09-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1995-06-01
Shut-In
—
Plugged
2001-10-16
EWA / Production operator mismatch
Scheduling: LYON OPERATING COMPANY INC.(III) ≠ Production: INTERSTATE EXPLORATIONS LLC (reported 2021-03)
Resolved via: scheduling → LYON OPERATING COMPANY INC.(III)
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2024-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 995 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| PALO PINTO | 2,020 ft | -1,025 ft |
| BRYSON LIME (Bryson) | 3,912 ft | -2,917 ft |
| CADDO LIME (Caddo) | 5,530 ft | -4,535 ft |
| MARBLE FALLS | 5,820 ft | -4,825 ft |
| BARNET SHALE | 6,050 ft | -5,055 ft |
| ELLENBURGER LIME (Ellenburger) | 6,290 ft | -5,295 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 6,390–6,400 ft | Perforated |
| ?–6,400 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 480 ft | 270 sx |
| 10.75" | 493 ft | 270 sx |
| 4.5" | 6,552 ft | 350 sx |
| 2.875" | 8,278 ft | 400 sx |
Permit History (1)
Applications (1)
Records & Logs
5 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 8,300 ft
- Drill Type
- Vertical
- County
- CLAY
- District
- 9
- Operator
- LYON OPERATING COMPANY INC.(III)
- Completed
- 1995-06-01
Operator
- Location
- JACKSBORO
- P-5 Status
- Active (filed 2025-12-10)
- Cum Oil (all leases)
- 105,130 bbl
- Cum Gas (all leases)
- 855,700 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 10