42-081-30741

Final Completion

HIGGINS

COKE County · District 7 · ATAPCO · HIGGINS RANCH (CANYON)

Permits

3

Max Depth

7,100 ft

First Permit

1979-02-23

Latest Activity

2011-02-04

Lifespan

32 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-03-24

Shut-In

Plugged

1995-10-03

!

EWA / Production operator mismatch

Scheduling: ATAPCO ≠ Production: SCOUT ENERGY MANAGEMENT LLC (reported 2026-03)

!

EWA / Permit operator mismatch

Scheduling: ATAPCO ≠ Permit: L.C.S. PRODUCTION COMPANY

Resolved via: productionSCOUT ENERGY MANAGEMENT LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

H-1 Injection Active UIC #000102779 permitted 2011-01-24

Permitted Volume

1,500 bbl/d

Max Pressure

2,700 psi

Injection Interval

5,812–5,984 ft

Injected (12mo)

1,163 bbl

Monthly injected volume (bbl, from H-10 filings through 2026-02-01)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (9) Elevation 2,292 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CANYON REEF (Canyon)5,812 ft-3,520 ft
CANYON
CISCO
COLEMAN JUNCTION
PENNSYLVANIAN
PROBLEM ZONE - SALTWATER FLOW; N
PROBLEM ZONE - SALTWATER FLOW; S
STRAWN
WOLFCAMP

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (4)

IntervalType
5,890–5,893 ftPerforated
5,890–5,953 ftPerforated
5,903–5,910 ftPerforated
5,945–5,953 ftPerforated

Casing (4)

SizeSet DepthCement
8.625"557 ft300 sx
5.5"2,045 ft200 sx
2.875"5,862 ft
5.5"5,998 ft130 sx

Permit History (3)

Applications (3)

#709234 A L.C.S. PRODUCTION COMPANY
received 2011-01-26
#74302 A NATOMAS NORTH AMERICA, INC.
received 1980-03-05
#43188 A NATOMAS NORTH AMERICA, INC.
received 1979-02-23

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 2016-01-26
W-2/G-1 2011-11-15 log on file
W-2/G-1 1979-04-06

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in COKE County.

Well Details

Well Number
10WI
Max Depth
7,100 ft
Drill Type
Vertical
County
COKE
District
7
Operator
ATAPCO
Completed
1979-03-24

Operator

Name
ATAPCO
Location
HOUSTON
P-5 Status
Inactive (filed 1998-12-31)
Cum Oil (all leases)
1,923,880 bbl
Cum Gas (all leases)
11,478,713 mcf
Total Permits
445