42-081-31711

OM KEENEY

COKE County · District 7 · BOAZ ENERGY II OPERATING, LLC

Permits

3

Max Depth

5,700 ft

First Permit

1996-01-22

Latest Activity

2022-01-13

Lifespan

26 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (9) Elevation 1,819 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
WICHITA ALBANY (Wichita-Albany)1,302 ft+517 ft
CISCO 3,475 ft-1,656 ft
PALO PINTO 3,890 ft-2,071 ft
CAPPS4,310 ft-2,491 ft
PALO PINTO 4,310 ft-2,491 ft
CAPPS4,582 ft-2,763 ft
GOEN4,815 ft-2,996 ft
GARDNER5,203 ft-3,384 ft
CAMBRIAN5,318 ft-3,499 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-081-32078 R. E. HICKMAN · MEMORIAL PRODUCTION OPER. LLC
0.3 mi
Palo Pinto 4,296'CAPPS 4,570'GOEN 4,799'GARDNER 5,066'ODOM 5,194'Cisco Strawn PROBLEM ZONE - SALTWATER FLOW; S Canyon PROBLEM ZONE - SALTWATER FLOW; N Coleman Junction Pennsylvanian +1 more
42-081-32086 R.E HICKMAN · MEMORIAL PRODUCTION OPER. LLC
0.4 mi
Palo Pinto 4,310'CROSS CUT 4,476'CAPPS 4,570'GOEN 4,810'Pennsylvanian Wolfcamp Cisco Strawn PROBLEM ZONE - SALTWATER FLOW; N Canyon Coleman Junction PROBLEM ZONE - SALTWATER FLOW; S
42-081-00362 R.E. HICKMAN · BOAZ ENERGY, LLC
0.6 mi
CROSS-CUT SAND 4,435'CAPPS LIME 4,566'CAPPS LIME 4,590'GOEN LIME 4,780'
42-081-00277 NANNIE · BOAZ ENERGY II OPERATING, LLC
0.8 mi
Coleman Junction 2,008'Wolfcamp 2,164'Canyon 3,921'Palo Pinto 4,357'PROBLEM ZONE - SALTWATER FLOW; S Pennsylvanian PROBLEM ZONE - SALTWATER FLOW; N Cisco Strawn
42-081-00276 BRONTE PALO PINTO UNIT · BOAZ ENERGY II OPERATING, LLC
0.9 mi
Coleman Junction 2,008'Wolfcamp 2,148'Canyon 3,918'Palo Pinto 4,330'PROBLEM ZONE - SALTWATER FLOW; S Pennsylvanian PROBLEM ZONE - SALTWATER FLOW; N Cisco Strawn
42-081-31953 J.L. BRUNSON 'C' · GRANDFIELD CONSULTING, INC.
1.3 mi
Palo Pinto 4,223'Palo Pinto 4,338'CROSS-CUT 4,498'GOEN 4,838'GOEN 4,840'GARDNER SAND 5,047'Ellenburger 5,298'CAMBRIAN 5,371'
42-081-32041 J.L. BRUNSON · MEMORIAL PRODUCTION OPER. LLC
1.5 mi
Palo Pinto 4,342'CAPPS 4,633'GOEN 4,857'GARDNER 5,109'BRONTE SODOR (ELLENBURGER) 5,340'CAMBRIAN SAND 5,501'
42-081-32134 BOWEN · GUNGOLL, CARL E. EXPLORATION LLC
8.5 mi
Coleman Junction 2,950'Cisco 4,500'Canyon 4,870'Strawn 5,270'Ellenburger 6,544'Pennsylvanian Wolfcamp PROBLEM ZONE - SALTWATER FLOW; N PROBLEM ZONE - SALTWATER FLOW; S

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (3)

IntervalType
4,815–4,820 ftPerforated
5,318–5,340 ftPerforated
5,330–5,345 ftPerforated

Casing (3)

SizeSet DepthCement
9.625"331 ft270 sx
7"5,498 ft1,325 sx
7"725 sx

Permit History (3)

Applications (3)

#875766 A BOAZ ENERGY II OPERATING, LLC
received 2022-01-05
#761651 A BOAZ ENERGY, LLC
received 2013-04-29
#443929 A EXXON CORP.
received 1996-01-22

Records & Logs

4 completion filings on record · 1 with log images at RRC.

W-2/G-1 2013-06-13
W-2/G-1 1997-10-07
W-2/G-1 1996-04-25 log on file
W-2/G-1 1996-05-14

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.885461
Lon -100.316427

Well Details

Well Number
305
Max Depth
5,700 ft
Drill Type
Vertical
County
COKE
District
7

Operator

Location
MIDLAND
P-5 Status
Active (filed 2025-11-14)
Cum Oil (all leases)
5,822,205 bbl
Cum Gas (all leases)
800,574 mcf
Activities
OPRS/O
Total Permits
146