42-081-00277

BRONTE PALO PINTO UNIT

COKE County · District 7 · R3 OPERATING CORPORATION · BRONTE

Permits

2

Max Depth

4,800 ft

First Permit

2021-10-21

Latest Activity

2021-10-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1970-05-07

!

EWA / Permit operator mismatch

Scheduling: R3 OPERATING CORPORATION ≠ Permit: BOAZ ENERGY II OPERATING, LLC

Resolved via: productionR3 OPERATING CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (9) Elevation 1,808 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION 2,008 ft-200 ft
WOLFCAMP 2,164 ft-356 ft
CANYON 3,921 ft-2,113 ft
PALO PINTO 4,357 ft-2,549 ft
CISCO
PENNSYLVANIAN
PROBLEM ZONE - SALTWATER FLOW; N
PROBLEM ZONE - SALTWATER FLOW; S
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-081-00276 BRONTE PALO PINTO UNIT · BOAZ ENERGY II OPERATING, LLC
0.3 mi
Coleman Junction 2,008'Wolfcamp 2,148'Canyon 3,918'Palo Pinto 4,330'Cisco PROBLEM ZONE - SALTWATER FLOW; S PROBLEM ZONE - SALTWATER FLOW; N Strawn Pennsylvanian
42-081-00362 R.E. HICKMAN · BOAZ ENERGY, LLC
0.6 mi
CROSS-CUT SAND 4,435'CAPPS LIME 4,566'CAPPS LIME 4,590'GOEN LIME 4,780'
42-081-32086 R.E HICKMAN · MEMORIAL PRODUCTION OPER. LLC
0.6 mi
Palo Pinto 4,310'CROSS CUT 4,476'CAPPS 4,570'GOEN 4,810'PROBLEM ZONE - SALTWATER FLOW; N Strawn Canyon Coleman Junction PROBLEM ZONE - SALTWATER FLOW; S Pennsylvanian Wolfcamp Cisco
42-081-31711 OM KEENEY · EXXON CORP.
0.8 mi
Wichita-Albany 1,302'Cisco 3,475'Palo Pinto 3,890'Palo Pinto 4,310'CAPPS 4,310'CAPPS 4,582'GOEN 4,815'GARDNER 5,203'CAMBRIAN 5,318'
42-081-32078 R. E. HICKMAN · MEMORIAL PRODUCTION OPER. LLC
0.8 mi
Palo Pinto 4,296'CAPPS 4,570'GOEN 4,799'GARDNER 5,066'ODOM 5,194'Pennsylvanian Wolfcamp Cisco PROBLEM ZONE - SALTWATER FLOW; S PROBLEM ZONE - SALTWATER FLOW; N Strawn Canyon +1 more
42-081-31953 J.L. BRUNSON 'C' · GRANDFIELD CONSULTING, INC.
1.1 mi
Palo Pinto 4,223'Palo Pinto 4,338'CROSS-CUT 4,498'GOEN 4,838'GOEN 4,840'GARDNER SAND 5,047'Ellenburger 5,298'CAMBRIAN 5,371'
42-081-32041 J.L. BRUNSON · MEMORIAL PRODUCTION OPER. LLC
1.2 mi
Palo Pinto 4,342'CAPPS 4,633'GOEN 4,857'GARDNER 5,109'BRONTE SODOR (ELLENBURGER) 5,340'CAMBRIAN SAND 5,501'
42-081-32134 BOWEN · GUNGOLL, CARL E. EXPLORATION LLC
8.5 mi
Coleman Junction 2,950'Cisco 4,500'Canyon 4,870'Strawn 5,270'Ellenburger 6,544'PROBLEM ZONE - SALTWATER FLOW; S PROBLEM ZONE - SALTWATER FLOW; N Pennsylvanian Wolfcamp

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (2)

IntervalType
4,358–4,362 ftPerforated
4,520–4,528 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"619 ft300 sx
5.5"4,350 ft550 sx

Permit History (2)

Applications (2)

#873159 A BOAZ ENERGY II OPERATING, LLC
received 2022-02-18
#873159 A BOAZ ENERGY II OPERATING, LLC
received 2021-09-28

Records & Logs

2 completion filings on record.

W-2/G-1 2022-06-20
W-2/G-1 1984-01-12

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

Lat 31.879057
Lon -100.326937

Well Details

Well Number
21
Max Depth
4,800 ft
Drill Type
Vertical
County
COKE
District
7

Operator

Location
GREENWOOD V, LG
P-5 Status
Active (filed 2025-09-15)
Cum Oil (all leases)
310,146 bbl
Cum Gas (all leases)
18,210 mcf
Activities
OPRS/G, OPRS/O