42-095-31246
Final CompletionSORRELL
CONCHO County · District 7 · REUNION EXPLORATION INC. · PATE (STRAWN LIME)
Permits
1
Max Depth
4,600 ft
First Permit
1990-12-17
Latest Activity
1990-12-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-02-03
Shut-In
—
Plugged
1996-04-19
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (4) Elevation 2,169 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CANYON LIME (Canyon) | 3,054 ft | -885 ft |
| CROSS CUT SAND | 3,624 ft | -1,455 ft |
| STRAWN | 4,040 ft | -1,871 ft |
| GOEN | 4,197 ft | -2,028 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,076–4,086 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 396 ft | 180 sx |
| 4.5" | 4,288 ft | 210 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,600 ft
- Drill Type
- Vertical
- County
- CONCHO
- District
- 7
- Operator
- REUNION EXPLORATION INC.
- Completed
- 1991-02-03
Operator
- Name
- REUNION EXPL, INC
- Location
- ABILENE
- P-5 Status
- Inactive (filed 1993-01-22)
- Cum Oil (all leases)
- 384 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 3