42-095-31246

Final Completion

SORRELL

CONCHO County · District 7 · REUNION EXPLORATION INC. · PATE (STRAWN LIME)

Permits

1

Max Depth

4,600 ft

First Permit

1990-12-17

Latest Activity

1990-12-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-02-03

Shut-In

Plugged

1996-04-19

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 2,169 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CANYON LIME (Canyon)3,054 ft-885 ft
CROSS CUT SAND3,624 ft-1,455 ft
STRAWN 4,040 ft-1,871 ft
GOEN4,197 ft-2,028 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
4,076–4,086 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"396 ft180 sx
4.5"4,288 ft210 sx

Permit History (1)

Applications (1)

#382320 A REUNION EXPLORATION, INC.
received 1990-12-13

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1991-02-19 log on file
W-2/G-1 1991-02-27

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in CONCHO County.

Well Details

Well Number
1
Max Depth
4,600 ft
Drill Type
Vertical
County
CONCHO
District
7
Completed
1991-02-03

Operator

Location
ABILENE
P-5 Status
Inactive (filed 1993-01-22)
Cum Oil (all leases)
384 bbl
Cum Gas (all leases)
— mcf
Total Permits
3