42-103-34011
Final CompletionCORDONA LAKE CONSOLIDATED UNIT
CRANE County · District 8 · HILCORP ENERGY COMPANY · CORDONA LAKE
Permits
1
Max Depth
6,200 ft
First Permit
1990-01-23
Latest Activity
1990-01-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1991-05-23
Shut-In
—
Plugged
—
EWA / Permit operator mismatch
Scheduling: HILCORP ENERGY COMPANY ≠ Permit: EXXON CORP.
Resolved via: production → HILCORP ENERGY COMPANY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
1,500 bbl/d
Max Pressure
2,500 psi
Injection Interval
5,000–5,700 ft
Injected (12mo)
19,740 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-06-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (16) Elevation 2,337 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RUSTLER | 378 ft | +1,959 ft |
| SALADO | 489 ft | +1,848 ft |
| TANSEL | 1,310 ft | +1,027 ft |
| TANSILL | 1,310 ft | +1,027 ft |
| YATES | 1,387 ft | +950 ft |
| SEVEN RIVERS | 1,608 ft | +729 ft |
| GRAYBURG | 2,306 ft | +31 ft |
| SAN ANGELO | 3,246 ft | -909 ft |
| UPPER CLEARFORK (Clear Fork) | 3,723 ft | -1,386 ft |
| TUBB | 3,988 ft | -1,651 ft |
| TUBB | 4,024 ft | -1,687 ft |
| WICHITA ALBANY (Wichita-Albany) | 4,479 ft | -2,142 ft |
| WICHITA (Wichita-Albany) | 4,482 ft | -2,145 ft |
| DEVONIAN | 5,313 ft | -2,976 ft |
| SILURIAN (Silurian (undifferentiated)) | 5,550 ft | -3,213 ft |
| SILURIAN (Silurian (undifferentiated)) | 5,559 ft | -3,222 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 5,313–5,481 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 648 ft | 425 sx |
| 5.5" | 5,580 ft | 1,670 sx |
Permit History (1)
Applications (1)
Records & Logs
7 completion filings on record · 2 with log images at RRC.
+1 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 103
- Max Depth
- 6,200 ft
- Drill Type
- Vertical
- County
- CRANE
- District
- 8
- Operator
- HILCORP ENERGY COMPANY
- Completed
- 1991-05-23
Operator
- Name
- HILCORP ENGY CO
- Location
- HOUSTON
- P-5 Status
- X (filed 2026-03-27)
- Cum Oil (all leases)
- 75,699,281 bbl
- Cum Gas (all leases)
- 1,779,939,645 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 3,428