42-109-33116

PRODUCING Horizontal

GRISSOM

CULBERSON County · District 8 · COG OPERATING LLC · FORD WEST (WOLFCAMP)

Permits

1

Max Depth

9,700 ft

First Permit

2017-07-05

Latest Activity

2017-07-05

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2018-07-08

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2018-07

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 3,134 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
RUSTLER 525 ft+2,609 ft
DELAWARE 2,368 ft+766 ft
FORD-DELAWARE (Delaware)2,500 ft+634 ft
CHERRY CANYON 3,302 ft-168 ft
BONE SPRINGS (Bone Spring)6,150 ft-3,016 ft
WOLFCAMP 7,900 ft-4,766 ft
MISSISSIPPIAN 8,900 ft-5,766 ft
ATOKA
MORROW
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-109-33117 GRISSOM · COG OPERATING LLC
0.0 mi
Rustler 524'Delaware 2,367'Delaware 2,500'Cherry Canyon 3,301'Bone Spring 6,052'Mississippian 8,900'Wolfcamp 9,064'Atoka Morrow Strawn
42-109-33124 GRISSOM · COG OPERATING LLC
0.0 mi
Rustler 528'Delaware 2,375'Delaware 2,600'Cherry Canyon 3,309'Bone Spring 6,060'Mississippian 8,900'Morrow Atoka Strawn Wolfcamp
42-109-33125 GRISSOM · COG OPERATING LLC
0.0 mi
Rustler 522'Delaware 2,369'Delaware 2,500'Cherry Canyon 3,600'Bone Spring 6,054'Mississippian 8,900'Wolfcamp 9,066'Atoka 11,600'Morrow 11,800'Strawn 12,800'
42-109-33505 HAY BLAKE 7/6 · CHEVRON U. S. A. INC.
0.1 mi
Brushy Canyon 4,577'Bone Spring 6,113'Avalon 6,215'Bone Spring 7,002'Bone Spring 7,772'Bone Spring 8,770'Delaware Rustler Atoka Strawn Cherry Canyon Delaware +3 more
42-109-33504 HAY BLAKE 7/6 · CHEVRON U. S. A. INC.
0.1 mi
Lamar 2,392'Bell Canyon 2,424'Cherry Canyon 3,295'Brushy Canyon 4,569'Bone Spring 6,095'Avalon 6,193'Bone Spring 6,996'Wolfcamp Morrow Delaware Rustler Atoka +3 more
42-109-33503 HAY BLAKE 7/6 · CHEVRON U. S. A. INC.
0.1 mi
Lamar 2,385'Bell Canyon 2,419'Cherry Canyon 3,295'Brushy Canyon 4,572'Bone Spring 6,092'Avalon 6,194'Bone Spring 6,992'Bone Spring 7,764'Bone Spring 8,762'Wolfcamp 9,098'Rustler Delaware +4 more
42-109-33502 HAY BLAKE 7/6 · CHEVRON U. S. A. INC.
0.1 mi
Cherry Canyon 3,291'Brushy Canyon 4,557'Bone Spring 6,093'Avalon 6,186'Avalon 6,186'Bone Spring 6,987'Bone Spring 7,753'Bone Spring 8,752'Delaware Rustler Delaware
42-109-33501 HAY BLAKE 7/6 · CHEVRON U. S. A. INC.
0.1 mi
Lamar 2,391'Bell Canyon 2,425'Cherry Canyon 3,299'Brushy Canyon 4,548'Bone Spring 6,091'Avalon 6,190'Bone Spring 6,986'Rustler Delaware Delaware

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
9,640–14,087 ftPerforated

Casing (3)

SizeSet DepthCement
13.375"424 ft450 sx
9.625"2,404 ft900 sx
7"8,910 ft600 sx

Permit History (1)

Applications (1)

#827093 A COG OPERATING LLC
received 2017-05-24

Records & Logs

1 completion filing on record · 1 with log images at RRC.

W-2/G-1 2019-01-22 log on file
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 31.969746
Lon -104.105446

Well Details

Well Number
1838H
Max Depth
9,700 ft
Drill Type
Horizontal
County
CULBERSON
District
8
Completed
2018-07-08

Operator

Location
MIDLAND
P-5 Status
X (filed 2026-06-02)
Cum Oil (all leases)
645,285,792 bbl
Cum Gas (all leases)
305,183,488 mcf
Activities
OPRS/G, OPRS/O
Total Permits
4,547