42-109-34218

PRODUCING Horizontal

HAY ROSALIE

CULBERSON County · District 8 · CHEVRON U. S. A. INC. · FORD WEST (WOLFCAMP)

Permits

1

Max Depth

10,000 ft

First Permit

2024-03-12

Latest Activity

2024-03-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2025-02-28

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2024-06

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (10) Elevation 3,090 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CHERRY CANYON 3,250 ft-160 ft
BONE SPRING 5,994 ft-2,904 ft
WOLFCAMP 8,961 ft-5,871 ft
ATOKA
CAPITAN REEF (Capitan)
DELAWARE
FORD / DELAWARE (Delaware)
MORROW
RUSTLER
STRAWN

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-109-34219 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Lamar 2,377'Bell Canyon 2,402'Cherry Canyon 3,257'Bone Spring 6,005'Avalon 6,071'SECOND BONE UPPER 7,578'Wolfcamp 8,979'Morrow Capitan Delaware Delaware Rustler +2 more
42-109-34220 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Lamar 2,379'Bell Canyon 2,409'Cherry Canyon 3,265'Bone Spring 6,019'Avalon 6,085'SECOND BONE UPPER 7,589'Wolfcamp 8,999'Strawn Delaware Morrow Capitan Delaware +2 more
42-109-34221 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Lamar 2,386'Bell Canyon 2,423'Cherry Canyon 3,280'Bone Spring 6,038'Avalon 6,098'FIRST BONE UPPER 6,988'Wolfcamp 9,011'Delaware Morrow Capitan Delaware Rustler +2 more
42-109-34222 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Cherry Canyon 3,289'Bone Spring 6,051'Wolfcamp 9,031'Delaware Delaware Atoka Strawn Rustler Morrow Capitan
42-109-34223 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Lamar 2,394'Bell Canyon 2,425'Cherry Canyon 3,294'Bone Spring 6,064'Avalon 6,128'FIRST BONE UPPER 7,008'Wolfcamp 9,042'Delaware Rustler Delaware Capitan Morrow +2 more
42-109-34224 HAY ROSALIE · CHEVRON U. S. A. INC.
0.0 mi
Lamar 2,401'Bell Canyon 2,432'Cherry Canyon 3,300'Bone Spring 6,077'Avalon 6,141'FIRST BONE UPPER 7,025'Wolfcamp 9,060'Rustler Atoka Strawn Delaware Morrow +2 more
42-109-32906 SHELLY FEE 40 · CAPITAN ENERGY, INCORPORATED
0.2 mi
Delaware 2,360'Delaware 2,414'Cherry Canyon 3,325'Bone Spring 6,020'Wolfcamp 9,009'Atoka Strawn Mississippian Rustler Morrow
42-109-33280 TYSON FEE 44 · CAPITAN ENERGY, INCORPORATED
0.7 mi
Rustler 433'Delaware 2,326'Delaware 2,383'Cherry Canyon 3,291'Bone Spring 5,959'Wolfcamp 8,946'Morrow Atoka Strawn Mississippian

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (1)

IntervalType
9,753–14,513 ftPerforated

Casing (2)

SizeSet DepthCement
9.625"2,418 ft973 sx
7"9,025 ft1,145 sx

Permit History (1)

Applications (1)

#898007 A CHEVRON U. S. A. INC.
received 2024-03-06

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2025-08-25
W-2/G-1 2024-09-17 log on file
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 31.779431
Lon -104.069386

Well Details

Well Number
0011WA
Max Depth
10,000 ft
Drill Type
Horizontal
County
CULBERSON
District
8
Completed
2025-02-28

Operator

Location
MIDLAND
P-5 Status
Active (filed 2026-01-30)
Cum Oil (all leases)
633,048,621 bbl
Cum Gas (all leases)
4,264,158,043 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,272