42-165-31596
Final CompletionRUSSELL (CLEARFORK 7000) UNIT
GAINES County · District 8 · XTO ENERGY INC. · RUSSELL (CLEARFORK CONSOLIDATED
Permits
1
Max Depth
7,800 ft
First Permit
1979-04-09
Latest Activity
1979-04-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2009-07-16
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: XTO ENERGY INC. ≠ Production: HILCORP ENERGY COMPANY (reported 2026-04)
EWA / Permit operator mismatch
Scheduling: XTO ENERGY INC. ≠ Permit: MOBIL OIL CORPORATION
Resolved via: production → HILCORP ENERGY COMPANY
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
3,000 bbl/d
Max Pressure
3,100 psi
Injection Interval
6,200–7,750 ft
Injected (12mo)
65,196 bbl
Monthly injected volume (bbl, from H-10 filings through 2026-02-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (11) Elevation 3,542 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| YATES | 2,915 ft | +627 ft |
| SEVEN RIVERS | 3,097 ft | +445 ft |
| QUEEN | 3,717 ft | -175 ft |
| SAN ANDRES | 4,497 ft | -955 ft |
| GLORIETA | 5,977 ft | -2,435 ft |
| CLEARFORK (Clear Fork) | 6,335 ft | -2,793 ft |
| UPPER CLEARFORK (Clear Fork) | 6,335 ft | -2,793 ft |
| TUBB | 7,236 ft | -3,694 ft |
| TUBB | 7,238 ft | -3,696 ft |
| LOWER CLEARFORK (Clear Fork) | 7,320 ft | -3,778 ft |
| LOWER CLEARFORK (Clear Fork) | 7,321 ft | -3,779 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (3)
| Interval | Type |
|---|---|
| 6,481–7,626 ft | Perforated |
| 7,330–7,626 ft | Perforated |
| 7,453–7,676 ft | Perforated |
Casing (5)
| Size | Set Depth | Cement |
|---|---|---|
| 12.75" | 401 ft | 450 sx |
| 12.75" | 401 ft | — |
| 8.625" | 4,350 ft | 1,600 sx |
| 8.625" | 4,350 ft | — |
| 2.875" | 7,607 ft | — |
Permit History (1)
Applications (1)
Records & Logs
8 completion filings on record.
+2 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 222
- Max Depth
- 7,800 ft
- Drill Type
- Vertical
- County
- GAINES
- District
- 8
- Operator
- XTO ENERGY INC.
- Completed
- 2009-07-16
Operator
- Name
- XTO ENGY INC
- Location
- SPRING
- P-5 Status
- X (filed 2026-04-08)
- Cum Oil (all leases)
- 772,419,164 bbl
- Cum Gas (all leases)
- 11,039,899,986 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 16,139