42-165-32970

Final Completion

TAYLOR

GAINES County · District 8 · SMITH PIPE OF ABILENE · CARTER-NEW MEXICO (SAN ANDRES)

Permits

1

Max Depth

5,300 ft

First Permit

1984-09-18

Latest Activity

1984-09-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-10-31

Shut-In

Plugged

2003-12-17

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1998-12)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WHEELER, W. RIDLEY, EST.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2004-01

Injection / Disposal

H-1 Injection Plugged 2003-12-23 UIC #000054461 permitted 1985-01-03

Permitted Volume

Max Pressure

Injection Interval

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (1) Elevation 3,630 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
SAN ANDRES P1 (San Andres)5,042 ft-1,412 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,042–5,210 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"310 ft225 sx
5.5"5,042 ft1,100 sx

Permit History (1)

Applications (1)

#252060 A WHEELER, W. RIDLEY, EST.
received 1984-09-17

Records & Logs

2 completion filings on record.

W-2/G-1 1985-01-09
W-2/G-1 1985-01-23
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in GAINES County.

Well Details

Well Number
2W
Max Depth
5,300 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
1984-10-31

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf