42-165-36199

Final Completion

BAGGETT DEBBIE

GAINES County · District 8 · PARALLEL PETROLEUM CORPORATION · HARRIS (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

2004-08-26

Latest Activity

2004-08-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2004-12-04

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: PARALLEL PETROLEUM CORPORATION ≠ Production: PARALLEL PETROLEUM LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: PARALLEL PETROLEUM CORPORATION ≠ Permit: LYNX OPERATING CO., INC.

Resolved via: productionPARALLEL PETROLEUM LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-12

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#550141 A LYNX OPERATING CO., INC.
received 2004-08-26

Well Details

Well Number
8A
Max Depth
5,100 ft
Drill Type
Vertical
County
GAINES
District
8
Completed
2004-12-04

Operator

Location
MIDLAND
P-5 Status
Y (filed 2011-06-03)
Cum Oil (all leases)
5,224,821 bbl
Cum Gas (all leases)
6,590,867 mcf
Total Permits
301

External Links

Live © 2026 Petrora