42-197-30657

Final Completion

TOLE-TABOR

HARDEMAN County · District 9 · LARSON PERRY L OPERATING CO INC · BERRY WEST (MISS)

Permits

1

Max Depth

9,000 ft

First Permit

1984-03-13

Latest Activity

1984-03-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-05-17

Shut-In

Plugged

2009-07-17

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (6) Elevation 1,418 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
GUNSITE4,635 ft-3,217 ft
CANYON 5,330 ft-3,912 ft
MORROW 7,456 ft-6,038 ft
MISSISSIPPIAN 7,698 ft-6,280 ft
BARNETT SHALE (Barnett)7,935 ft-6,517 ft
MERIMAC8,090 ft-6,672 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
8,218–8,228 ftPerforated

Casing (2)

SizeSet DepthCement
10.75"425 ft300 sx
4.5"8,232 ft375 sx

Permit History (1)

Applications (1)

#233051 A LARSON, PERRY L OPERATING CO INC
received 1984-03-13

Records & Logs

2 completion filings on record.

W-2/G-1 1984-05-24
W-2/G-1 1984-05-24

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HARDEMAN County.

Well Details

Well Number
1
Max Depth
9,000 ft
Drill Type
Vertical
County
HARDEMAN
District
9
Completed
1984-05-17

Operator

Location
DALLAS
P-5 Status
Inactive (filed 2020-02-20)
Cum Oil (all leases)
1,383,049 bbl
Cum Gas (all leases)
1,904,773 mcf
Total Permits
23