42-207-31906
Final CompletionROSE
HASKELL County · District 7 · ANVIL OPERATING INC. · TEXAS ROSE (CANYON REEF)
Permits
1
Max Depth
2,990 ft
First Permit
1987-10-23
Latest Activity
1987-10-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-12-08
Shut-In
—
Plugged
1990-12-06
EWA / Permit operator mismatch
Scheduling: ANVIL OPERATING INC. ≠ Permit: ANVIL PETROLEUM, INC. (TLT)
Resolved via: scheduling → ANVIL OPERATING INC.
Injection / Disposal
Permitted Volume
800 bbl/d
Max Pressure
1,400 psi
Injection Interval
2,854–2,900 ft
Injected (12mo)
—
Operator History
originally filed by ANVIL PETROLEUM, INC. (TLT) — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (1) Elevation 1,461 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| CANYON REEF (Canyon) | 2,852 ft | -1,391 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 2,854–2,860 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 105 ft | 50 sx |
| 4.5" | 2,896 ft | 100 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2A
- Max Depth
- 2,990 ft
- Drill Type
- Vertical
- County
- HASKELL
- District
- 7
- Operator
- ANVIL OPERATING INC.
- Completed
- 1987-12-08
Operator
- Name
- ANVIL OPER, INC
- Location
- ABILENE
- P-5 Status
- Inactive (filed 1992-01-02)
- Total Permits
- 2