Permits
2
Max Depth
7,125 ft
First Permit
1977-10-24
Latest Activity
1978-07-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
—
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
500 bbl/d
Max Pressure
1,300 psi
Injection Interval
1,640–1,730 ft
Injected (12mo)
—
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (5) Elevation 3,450 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| SANTA ROSA | 1,640 ft | +1,810 ft |
| YATES | 2,540 ft | +910 ft |
| SAN ANDRES | 3,797 ft | -347 ft |
| GLORIETA | 5,253 ft | -1,803 ft |
| TUBBS | 6,436 ft | -2,986 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 1,645–1,730 ft | Perforated |
| ?–7,035 ft | Perforated |
Casing (4)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 2,010 ft | 750 sx |
| 8.625" | 2,010 ft | — |
| 4.5" | 5,300 ft | — |
| 4.5" | 7,124 ft | 325 sx |
Permit History (2)
Applications (2)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 7,125 ft
- Drill Type
- Vertical
- County
- HOCKLEY
- District
- 8
- Operator
- NEW RESERVES GROUP, INC.
Operator
- Location
- OKLAHOMA CI, TY
- P-5 Status
- Inactive (filed 1990-07-09)
- Total Permits
- 34