42-219-33059

Final Completion

SMYER EAST (CLEARFORK) UNIT

HOCKLEY County · District 8 · UNION OIL COMPANY OF CALIFORNIA

Permits

3

Max Depth

11,530 ft

First Permit

1980-12-22

Latest Activity

1987-02-04

Lifespan

6 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1984-12-15

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3) Elevation 3,383 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
RUSTLER 1,955 ft+1,428 ft
YATES 2,550 ft+833 ft
CLEARFORK (Clear Fork)5,740 ft-2,357 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,808–5,918 ftPerforated

Casing (2)

SizeSet DepthCement
13.375"1,988 ft2,100 sx
9.625"6,496 ft2,300 sx

Permit History (3)

Applications (3)

#325898 A UNION OIL COMPANY OF CALIFORNIA
received 1987-01-28
#244777 A AMOCO PRODUCTION CO.-LEVELLAND
received 1984-07-09
#103078 A AMOCO PRODUCTION CO.-LEVELLAND
received 1980-12-22

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1987-03-02 log on file
W-2/G-1 1987-05-20

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in HOCKLEY County.

Well Details

Well Number
115
Max Depth
11,530 ft
Drill Type
Vertical
County
HOCKLEY
District
8

Operator

Location
MIDLAND
P-5 Status
Inactive (filed 2020-11-18)
Cum Oil (all leases)
78,952,713 bbl
Cum Gas (all leases)
197,557,199 mcf
Total Permits
2,336