42-253-31884

Final Completion

WINDHAM

JONES County · District 7 · FISHER JACK INC. · NOODLE W. (PALO PINTO)

Permits

2

Max Depth

5,400 ft

First Permit

1981-06-11

Latest Activity

1989-06-12

Lifespan

8 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-08-30

Shut-In

Plugged

1990-06-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (6) Elevation 1,909 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
B/COLEMAN JUNCTION2,166 ft-257 ft
CANYON SAND (Canyon)4,074 ft-2,165 ft
PALO PINTO 4,430 ft-2,521 ft
B/CAPPS4,852 ft-2,943 ft
B/CADDO5,352 ft-3,443 ft
ELLENBURGER 5,372 ft-3,463 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
4,434–4,457 ftPerforated
?–5,420 ftPerforated

Casing (3)

SizeSet DepthCement
8.625"135 ft85 sx
2.375"5,382 ft
4.5"5,390 ft450 sx

Permit History (2)

Applications (2)

#360246 A FISHER, JACK INC.
received 1989-06-09
#121375 A FISHER-WEBB, INC.
received 1981-06-11

Records & Logs

4 completion filings on record · 1 with log images at RRC.

W-2/G-1 1989-09-28 log on file
W-2/G-1 1989-10-19
W-2/G-1 1989-06-07
W-2/G-1 1981-08-03

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in JONES County.

Well Details

Well Number
2
Max Depth
5,400 ft
Drill Type
Vertical
County
JONES
District
7
Completed
1989-08-30

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2001-01-16)
Cum Oil (all leases)
455,584 bbl
Cum Gas (all leases)
111,601 mcf
Total Permits
82