42-253-31884
Final CompletionWINDHAM
JONES County · District 7 · FISHER JACK INC. · NOODLE W. (PALO PINTO)
Permits
2
Max Depth
5,400 ft
First Permit
1981-06-11
Latest Activity
1989-06-12
Lifespan
8 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1989-08-30
Shut-In
—
Plugged
1990-06-11
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (6) Elevation 1,909 ft (KB)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| B/COLEMAN JUNCTION | 2,166 ft | -257 ft |
| CANYON SAND (Canyon) | 4,074 ft | -2,165 ft |
| PALO PINTO | 4,430 ft | -2,521 ft |
| B/CAPPS | 4,852 ft | -2,943 ft |
| B/CADDO | 5,352 ft | -3,443 ft |
| ELLENBURGER | 5,372 ft | -3,463 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (2)
| Interval | Type |
|---|---|
| 4,434–4,457 ft | Perforated |
| ?–5,420 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 135 ft | 85 sx |
| 2.375" | 5,382 ft | — |
| 4.5" | 5,390 ft | 450 sx |
Permit History (2)
Applications (2)
Records & Logs
4 completion filings on record · 1 with log images at RRC.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 2
- Max Depth
- 5,400 ft
- Drill Type
- Vertical
- County
- JONES
- District
- 7
- Operator
- FISHER JACK INC.
- Completed
- 1989-08-30
Operator
- Name
- FISHER, JACK INC
- Location
- ABILENE
- P-5 Status
- Inactive (filed 2001-01-16)
- Cum Oil (all leases)
- 455,584 bbl
- Cum Gas (all leases)
- 111,601 mcf
- Total Permits
- 82