Permits
1
Max Depth
5,400 ft
First Permit
1983-07-29
Latest Activity
1983-07-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-08-20
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: ATAPCO ≠ Production: TEXLAND PETROLEUM, L.P. (reported 2026-04)
Resolved via: production → TEXLAND PETROLEUM, L.P.
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
500 bbl/d
Max Pressure
2,000 psi
Injection Interval
5,142–5,322 ft
Injected (12mo)
—
Monthly injected volume (bbl, from H-10 filings through 2026-03-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (3) Elevation 3,238 ft (GL)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| YATES | 2,190 ft | +1,048 ft |
| GLORIETA | 4,565 ft | -1,327 ft |
| CLEARFORK (Clear Fork) | 5,110 ft | -1,872 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 5,142–5,322 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 662 ft | 450 sx |
| 2.375" | 5,300 ft | — |
| 5.5" | 5,350 ft | 1,089 sx |
Permit History (1)
Applications (1)
Records & Logs
4 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet