42-353-31684

Final Completion

COMPTON M.L.

NOLAN County · District 7 · ENRICH OIL CORPORATION · JMM (CANYON)

Permits

1

Max Depth

6,200 ft

First Permit

1984-10-16

Latest Activity

1984-10-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-11-09

Shut-In

Plugged

1989-12-28

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (2) Elevation 2,482 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
FLIPPEN LM5,410 ft-2,928 ft
CANYON SD. CHANNEL (Canyon)5,719 ft-3,237 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (1)

IntervalType
5,719–5,795 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"405 ft325 sx
4.5"5,896 ft380 sx

Permit History (1)

Applications (1)

#254500 A ENRICH OIL CORPORATION
received 1984-10-12

Records & Logs

2 completion filings on record.

W-2/G-1 1984-11-19
W-2/G-1 1985-01-05

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
3
Max Depth
6,200 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1984-11-09

Operator

Location
ABILENE
P-5 Status
Active (filed 2026-03-25)
Cum Oil (all leases)
2,357,104 bbl
Cum Gas (all leases)
1,870,958 mcf
Activities
OPRS/G, OPRS/O
Total Permits
529