42-353-31852

Final Completion

WIGHT

NOLAN County · District 7 · WATCO ENERGY INC. · MARYNEAL (CANYON)

Permits

1

Max Depth

6,400 ft

First Permit

1985-08-28

Latest Activity

1985-08-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-10-15

Shut-In

Plugged

1995-10-31

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (5) Elevation 2,489 ft (GR)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COLEMAN JUNCTION 3,005 ft-516 ft
FLIPPEN LIME4,006 ft-1,517 ft
SWASTIKA SAND4,330 ft-1,841 ft
CANYON SAND (Canyon)5,594 ft-3,105 ft
STRAWN LIME (Strawn)5,750 ft-3,261 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (4)

IntervalType
5,594–5,598 ftPerforated
5,618–5,630 ftPerforated
5,633–5,637 ftPerforated
5,650–5,654 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"422 ft300 sx
4.5"5,915 ft400 sx

Permit History (1)

Applications (1)

#283406 A WATCO ENERGY, INC.
received 1985-08-12

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1985-11-04 log on file
W-2/G-1 1985-11-16

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
1
Max Depth
6,400 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1985-10-15

Operator

Location
TYLER
P-5 Status
Inactive (filed 1995-11-17)
Cum Oil (all leases)
60,275 bbl
Cum Gas (all leases)
161,364 mcf
Total Permits
97