42-353-32762

Final Completion

MCLEOD

NOLAN County · District 7 · SMITH PIPE OF ABILENE · WHITE HAT (ELLENBURGER)

Permits

1

Max Depth

7,300 ft

First Permit

2001-08-31

Latest Activity

2001-08-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2001-11-21

Shut-In

Plugged

2011-01-31

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: STANFORD-BEACH, INC. (reported 2008-06)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CROWNQUEST OPERATING, LLC

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-10

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (5) Elevation 2,428 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
CANYON 5,422 ft-2,994 ft
PALO PINTO 5,665 ft-3,237 ft
CADDO 6,770 ft-4,342 ft
ELLENBERGER (Ellenburger)6,950 ft-4,522 ft
ELLENBURGER 6,950 ft-4,522 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Perforations (2)

IntervalType
6,951–6,983 ftPerforated
7,021–7,040 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"375 ft215 sx
5.5"7,080 ft200 sx

Permit History (1)

Applications (1)

#513232 A CROWNQUEST OPERATING, LLC
received 2001-08-31

Records & Logs

3 completion filings on record · 1 with log images at RRC.

W-2/G-1 2002-10-09
W-2/G-1 2002-02-01 log on file
W-2/G-1 2002-02-14

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in NOLAN County.

Well Details

Well Number
1
Max Depth
7,300 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
2001-11-21

Operator

Location
ABILENE
P-5 Status
Inactive (filed 2014-08-29)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf