42-363-33150

Final Completion

RIEBE H.W.

PALO PINTO County · District 7 · CULEBRA OIL & GAS COMPANY · RIEBE (ATOKA CONGL)

Permits

2

Max Depth

4,000 ft

First Permit

1983-07-27

Latest Activity

1992-02-05

Lifespan

9 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-08-24

Shut-In

Plugged

1989-07-18

!

EWA / Production operator mismatch

Scheduling: CULEBRA OIL & GAS COMPANY ≠ Production: TRACER OPERATING, INC. (reported 2022-05)

!

EWA / Permit operator mismatch

Scheduling: CULEBRA OIL & GAS COMPANY ≠ Permit: ARLEDGE & YOUNG, INC.

Resolved via: schedulingCULEBRA OIL & GAS COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Injection / Disposal

W-14 Disposal Plugged 1996-05-09 UIC #000077255 permitted 1991-09-05

Permitted Volume

500 bbl/d

Max Pressure

750 psi

Injection Interval

2,298–2,314 ft

Injected (12mo)

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops

No tops on file for this well. Formation tops come from W-2/G-1 completion filings — this well has none yet, which is normal for permits that were never drilled, dry holes plugged without a filing, or wells completed before digital records. Offset-well tops can't be shown either — this well has no surface coordinates on file yet.

Check this well's filings at RRC ↗

Perforations (2)

IntervalType
2,298–2,314 ftPerforated
3,872–3,880 ftPerforated

Casing (5)

SizeSet DepthCement
8.625"210 ft140 sx
8.625"210 ft140 sx
2.375"3,800 ft
4.5"3,870 ft160 sx
4.5"3,890 ft160 sx

Permit History (2)

Applications (2)

#396214 A ARLEDGE & YOUNG, INC.
received 1992-01-27
#202992 A NICHOLS,EDWIN S EXPLORATIONS LTD
received 1983-07-27

Records & Logs

3 completion filings on record.

W-2/G-1 1992-01-06
W-2/G-1 1992-03-05
W-2/G-1 1983-09-20

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
2
Max Depth
4,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1983-08-24

Operator

Location
DALLAS
P-5 Status
Inactive (filed 2000-02-11)
Cum Oil (all leases)
1,639 bbl
Cum Gas (all leases)
1,971,101 mcf
Total Permits
5