42-363-34538

Final Completion

GREEN

PALO PINTO County · District 7 · TALON PRODUCTION INC. · PALO PINTO COUNTY REGULAR

Permits

1

Max Depth

1,550 ft

First Permit

1996-03-25

Latest Activity

1996-03-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-06-28

Shut-In

Plugged

1998-07-16

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-06

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (3)

CSV
FormationTop Depth (MD)
SAND LIME1,060 ft
CANYON 1,276 ft
STRAWN 1,500 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. View filings & logs at RRC ↗

Perforations (1)

IntervalType
1,500–1,506 ftPerforated

Casing (1)

SizeSet DepthCement
4.5"1,520 ft220 sx

Permit History (1)

Applications (1)

#446133 A TALON PRODUCTION, INC.
received 1996-03-21

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 1996-07-05 log on file
W-2/G-1 1996-07-19

Completion packets open directly (post-2011 filings include attached logs). Log images can't be deep-linked — clicking copies the API for you to paste.

No GPS coordinates yet

Coordinates come from the RRC GIS backfill and usually appear within days of permit issuance. Located in PALO PINTO County.

Well Details

Well Number
1
Max Depth
1,550 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1996-06-28

Operator

Location
WICHITA FAL, LS
P-5 Status
Inactive (filed 2001-06-20)
Cum Oil (all leases)
249,126 bbl
Cum Gas (all leases)
609,952 mcf
Total Permits
102