42-371-03888

PRODUCING

WAGNER

PECOS County · District 8 · SOIL ENERGY INC. · ABELL (WADDELL)

RRC Lookup

Permits

2

Max Depth

5,800 ft

First Permit

1983-11-21

Latest Activity

1986-03-26

Lifespan

2 yrs

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Well Details

Well Number
1
Max Depth
5,800 ft
Drill Type
Vertical
County
PECOS
District
8

External Links

EOF // multi-state drilling data platform // 2026