42-371-35489
Final CompletionUNIV. STANDARD
PECOS County · District 8 · TAYLOR-LINK OPERATING CO. · TAYLOR LINK W.(SAN ANDRES)
Permits
1
Max Depth
1,800 ft
First Permit
1985-04-10
Latest Activity
1985-04-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-07-17
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: TAYLOR-LINK OPERATING CO. ≠ Production: BJG OPERATING COMPANY (reported 2025-12)
!
EWA / Permit operator mismatch
Scheduling: TAYLOR-LINK OPERATING CO. ≠ Permit: MID-AMERICA PETROLEUM, INC.
Resolved via: production → BJG OPERATING COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#271818 A MID-AMERICA PETROLEUM, INC.
received 1985-04-01
Well Details
- Well Number
- 41I
- Max Depth
- 1,800 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- TAYLOR-LINK OPERATING CO.
- Completed
- 1985-07-17
Operator
- Name
- TAYLOR-LINK OPER CO
- Location
- MIDLAND
- P-5 Status
- Y (filed 1998-04-03)
- Cum Oil (all leases)
- 291,473 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 3