42-389-31449
Final CompletionFEE -32-
REEVES County · District 8 · TEXAS AMERICAN ROYALTY INC. · JESS BURNER (DELAWARE 3800)
Permits
1
Max Depth
4,300 ft
First Permit
1983-11-23
Latest Activity
1983-11-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-02-18
Shut-In
—
Plugged
1987-03-03
EWA / Permit operator mismatch
Scheduling: TEXAS AMERICAN ROYALTY INC. ≠ Permit: MARALO, INC.
Resolved via: scheduling → TEXAS AMERICAN ROYALTY INC.
Operator History
originally filed by MARALO, INC. — asset transferred
Formation Tops (6) Elevation 2,897 ft
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| RUSTLER | 40 ft | +2,857 ft |
| CASTILE | 870 ft | +2,027 ft |
| DEL MTN/LAMAR | 2,694 ft | +203 ft |
| BELL CANYON | 2,725 ft | +172 ft |
| CHERRY CANYON | 3,564 ft | -667 ft |
| MANZANETA | 3,810 ft | -913 ft |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 3,832–3,822 ft | Perforated |
Casing (2)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 340 ft | 250 sx |
| 5.5" | 4,400 ft | 1,555 sx |
Permit History (1)
Applications (1)
Records & Logs
2 completion filings on record.
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 1
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- REEVES
- District
- 8
- Operator
- TEXAS AMERICAN ROYALTY INC.
- Completed
- 1984-02-18
Operator
- Location
- MIDLAND
- P-5 Status
- Inactive (filed 1986-03-31)