42-413-31403

Final Completion

THORNBURG M.

SCHLEICHER County · District 7 · BOAZ ENERGY II OPERATING LLC · CAMAR SW. (STRAWN 4350)

Permits

3

Max Depth

4,650 ft

First Permit

1984-05-10

Latest Activity

2019-01-03

Lifespan

35 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2017-01-19

Shut-In

Plugged

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (4) Elevation 2,314 ft (KB)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
PALO PINTO 3,830 ft-1,516 ft
CANYON 3,920 ft-1,606 ft
STRAWN SAND (Strawn)4,268 ft-1,954 ft
STRAWN LIME (Strawn)4,414 ft-2,100 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-413-31275 THORNBURG, M. · CHISOS OPERATING, INC.
0.3 mi
Palo Pinto 3,797'Strawn 4,181'Strawn 4,394'
42-413-33000 THORNBURG · VX OPERATING, LLC
0.4 mi
Coleman Junction 1,200'Canyon 3,881'Strawn 4,437'Clear Fork Ellenburger San Angelo Wolfcamp
42-413-31460 HARZKE 29 · OIL PROJECTS, LLC
0.5 mi
Coleman Junction 1,400'Palo Pinto 3,833'HARKEY 4,112'CAMAR (UPPER) 4,330'CAMAR (LOWER) 4,368'Strawn 4,426'
42-413-32999 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
0.7 mi
Coleman Junction 1,422'Wolfcamp 2,058'Canyon 3,926'Strawn 4,302'Ellenburger San Angelo Clear Fork
42-413-31427 POWELL '28' · OIL PROJECTS, LLC
0.7 mi
Coleman Junction 1,380'Palo Pinto 3,780'HARKEY LIME 4,130'CAMAR 4,320'Strawn 4,378'
42-413-32989 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
0.8 mi
Coleman Junction 1,570'Wolfcamp 2,042'Canyon 3,618'Strawn 3,908'San Angelo Clear Fork Ellenburger
42-413-33001 POWELL 'A' · VX OPERATING, LLC
0.9 mi
Coleman Junction 1,250'Canyon 3,931'Strawn 4,256'Wolfcamp Clear Fork Ellenburger San Angelo
42-413-31378 THORNBURG 27 · MCCABE, JOHN Q.
0.9 mi
Palo Pinto 3,748'Canyon 4,197'STRAW LIME 4,318'Strawn 4,318'

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (7)

IntervalType
4,204–4,205 ftPerforated
4,284–4,288 ftPerforated
4,291–4,296 ftPerforated
4,300–4,312 ftPerforated
4,384–4,388 ftPerforated
4,415–4,425 ftPerforated
4,427–4,432 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"627 ft450 sx
4.5"4,550 ft1,100 sx

Permit History (3)

Applications (3)

#848140 A BOAZ ENERGY II OPERATING, LLC
received 2018-12-21
#361491 A CHISOS OPERATING, INC.
received 1989-07-13
#238382 A ARCO OIL & GAS CO.
received 1984-05-09

Records & Logs

6 completion filings on record · 1 with log images at RRC.

W-2/G-1 2019-02-18
W-2/G-1 2017-07-12
W-2/G-1 1989-07-25 log on file
W-2/G-1 1989-08-17
W-2/G-1 1984-07-31
W-2/G-1 1984-07-31
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 30.902711
Lon -100.202199

Well Details

Well Number
2
Max Depth
4,650 ft
Drill Type
Vertical
County
SCHLEICHER
District
7
Completed
2017-01-19

Operator

Location
MIDLAND
P-5 Status
Active (filed 2025-11-14)
Cum Oil (all leases)
5,822,205 bbl
Cum Gas (all leases)
800,574 mcf
Activities
OPRS/O
Total Permits
146