42-413-32581
Final CompletionCA-JO 6
SCHLEICHER County · District 7 · BOAZ ENERGY II OPERATING LLC · FORT MCKAVITT (LIME 4150)
Permits
1
Max Depth
4,999 ft
First Permit
2009-01-13
Latest Activity
2009-01-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2009-07-18
Shut-In
—
Plugged
—
EWA / Production operator mismatch
Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Production: R3 OPERATING CORPORATION (reported 2026-04)
EWA / Permit operator mismatch
Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Permit: TELESIS OPERATING CO., INC.
Resolved via: production → R3 OPERATING CORPORATION
Production Summary Production data is a work in progress — still being validated against RRC filings. Spot something off or have questions? [email protected]
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2009-01
Last Production
2026-07
Injection / Disposal
Permitted Volume
1,000 bbl/d
Max Pressure
1,965 psi
Injection Interval
3,980–4,430 ft
Injected (12mo)
731 bbl
Monthly injected volume (bbl, from H-10 filings through 2025-05-01)
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Formation Tops (11) Elevation 2,318 ft (GR)
CSV| Formation | Top Depth (MD) | Subsea (+above / −below SL) |
|---|---|---|
| COLEMAN JUNCTION | 1,350 ft | +968 ft |
| COLEMAN JUNCTION - NORTHERN HALF (Coleman Junction) | 1,350 ft | +968 ft |
| WOLFCAMP | 2,000 ft | +318 ft |
| GUNSIGHT | 2,647 ft | -329 ft |
| CANYON | 3,430 ft | -1,112 ft |
| ADAMS BRANCH LS | 3,769 ft | -1,451 ft |
| PALO PINTO LS (Palo Pinto) | 4,168 ft | -1,850 ft |
| CLEARFORK (Clear Fork) | — | — |
| ELLENBURGER | — | — |
| SAN ANGELO - 20 MILES NORTHWEST (San Angelo) | — | — |
| STRAWN | — | — |
As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗
Perforations (1)
| Interval | Type |
|---|---|
| 4,221–4,292 ft | Perforated |
Casing (3)
| Size | Set Depth | Cement |
|---|---|---|
| 8.625" | 590 ft | 310 sx |
| 8.625" | 625 ft | 310 sx |
| 4.5" | 4,438 ft | 250 sx |
Permit History (1)
Applications (1)
Records & Logs
8 completion filings on record · 5 with log images at RRC.
+2 more filings
Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.
No GPS coordinates yet
Well Details
- Well Number
- 603
- Max Depth
- 4,999 ft
- Drill Type
- Vertical
- County
- SCHLEICHER
- District
- 7
- Operator
- BOAZ ENERGY II OPERATING LLC
- Completed
- 2009-07-18
Operator
- Location
- MIDLAND
- P-5 Status
- Active (filed 2025-11-14)
- Cum Oil (all leases)
- 5,822,205 bbl
- Cum Gas (all leases)
- 800,574 mcf
- Activities
- OPRS/O
- Total Permits
- 146