42-413-32809

Final Completion

CAMAR SW (STRAWN) UNIT

SCHLEICHER County · District 7 · PILGRIM ENERGY PARTNERS L.L.C. · CAMAR SW. (STRAWN)

Permits

2

Max Depth

4,650 ft

First Permit

2012-01-24

Latest Activity

2021-04-13

Lifespan

9 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2012-04-25

Shut-In

Plugged

!

EWA / Permit operator mismatch

Scheduling: PILGRIM ENERGY PARTNERS L.L.C. ≠ Permit: OIL PROJECTS, LLC

Resolved via: productionPILGRIM ENERGY PARTNERS L.L.C.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-10

Last Production

2026-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Formation Tops (5) Elevation 2,259 ft (GL)

CSV
FormationTop Depth (MD)Subsea (+above / −below SL)
COOK SAND1,832 ft+427 ft
PALO PINTO 3,770 ft-1,511 ft
HARKEY4,096 ft-1,837 ft
CAMAR, SW4,308 ft-2,049 ft
STRAWN 4,384 ft-2,125 ft

As reported by operators on W-2/G-1 completion filings (RRC wellbore records). Depths are measured depth; names appear as filed. Subsea = reported elevation − measured depth (negative = below sea level; vertical wellbores only). View filings & logs at RRC ↗

Offset Well Tops (nearest 8 wells with tops)

What nearby completed wells reported.

Cross-section
42-413-33032 POWELL '28' · OIL PROJECTS, LLC
0.3 mi
Coleman Junction 1,070'Ellenburger San Angelo Strawn Clear Fork Canyon Wolfcamp
42-413-31427 POWELL '28' · OIL PROJECTS, LLC
0.5 mi
Coleman Junction 1,380'Palo Pinto 3,780'HARKEY LIME 4,130'CAMAR 4,320'Strawn 4,378'
42-413-33006 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
0.7 mi
Coleman Junction 1,366'Wolfcamp 2,038'Canyon 3,664'Strawn 3,904'Clear Fork San Angelo Ellenburger
42-413-32998 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
0.8 mi
Coleman Junction 1,328'Wolfcamp 2,428'Canyon 3,710'Strawn 3,977'Clear Fork Ellenburger San Angelo
42-413-33003 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
0.9 mi
Coleman Junction 1,378'Wolfcamp 2,027'Canyon 3,648'Strawn 3,906'San Angelo Ellenburger Clear Fork
42-413-31378 THORNBURG 27 · MCCABE, JOHN Q.
0.9 mi
Palo Pinto 3,748'Canyon 4,197'STRAW LIME 4,318'Strawn 4,318'
42-413-31460 HARZKE 29 · OIL PROJECTS, LLC
1.0 mi
Coleman Junction 1,400'Palo Pinto 3,833'HARKEY 4,112'CAMAR (UPPER) 4,330'CAMAR (LOWER) 4,368'Strawn 4,426'
42-413-32989 THORNBURG 27 · BOAZ ENERGY II OPERATING, LLC
1.2 mi
Coleman Junction 1,570'Wolfcamp 2,042'Canyon 3,618'Strawn 3,908'San Angelo Clear Fork Ellenburger

Nearest wells within 10 mi (surface locations). Click wells to select them, then open the cross-section to compare tops side by side (max 6 wells per section, including this one).

Perforations (2)

IntervalType
3,770–3,784 ftPerforated
4,308–4,316 ftPerforated

Casing (2)

SizeSet DepthCement
8.625"591 ft300 sx
5.5"4,485 ft365 sx

Permit History (2)

Applications (2)

#869022 A OIL PROJECTS, LLC
received 2021-04-08
#731609 A ARIES OPERATING, LP
received 2012-01-13

Records & Logs

2 completion filings on record · 1 with log images at RRC.

W-2/G-1 2022-03-04
W-2/G-1 2012-05-07 log on file
Completion packets + logs ↗ Wellbore filings ↗

Completion packets open directly (post-2011 filings include attached logs). Log images and the UL library can't be deep-linked — clicking copies the API for you to paste.

Lat 30.884958
Lon -100.206120

Well Details

Well Number
12
Max Depth
4,650 ft
Drill Type
Vertical
County
SCHLEICHER
District
7
Completed
2012-04-25

Operator

Location
FAIRFIELD
P-5 Status
Active (filed 2026-03-05)
Cum Oil (all leases)
28,606 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O